Lockyer Valley Planning Scheme
Temporary Local Planning Instrument 2024 (Flood Regulation)
Development within flood prone areas in the Lockyer Valley is regulated by the Temporary Local Planning Instrument 2026 (TLPI/2026) which took effect on 20 July 2026.
TLPI 2024 needs to be read in conjunction with Planning Scheme Overlay Maps.
The following are provided for reference:
- TLPI/2024 Map 1 - TLPI Flood Hazard overlay
- TLPI/2024 Map 2a Defined Flood Level - Peak Flood Level
- TLPI/2024 Map 2b Defined Flood Level - Peak Flood Depth
- TLPI/2024 Map 2c Defined Flood Level - Peak Flood Velocity
- TLPI/2024 Map 2d Defined Flood Level - Peak Flood Intensity
- TLPI/2024 Map 2e Defined Flood Level - Hydraulic Hazard
PDF Scheme Documents
Planning Scheme Policies
- PSP1 Biodiversity
- PSP2 Bushfire management plans
- PSP3 Cultural heritage
- PSP4 Flood hazard
- PSP5 Geotechnical assessment
- PSP6 Infrastructure design
- PSP7 Landscaping
- PSP8 Scenic landscape assessment
- PSP9 Stormwater management
- PSP10 Transport assessment
Planning Scheme PDF Maps
- ZM1 Zone Maps
- ZM2 Zone Precincts Maps
- SFM1 Strategic Framework - Growing Communities
- SFM2 Strategic Framework - Prosperous Economy
- SFM3 Strategic Framework - Connecting Infrastructure
- SFM4A Strategic Framework - Sustaining the natural environment - Habitat map
- SFM4B Strategic Framework - Sustaining the natural environment - Landscape Map
- SFM5 Strategic Framework - Living in a great place
- OM1 Agricultural Land overlay map
- OM3A Biodiversity - Ecological areas overlay
- OM3B Biodiversity - Wildlife habitat overlay
- OM3C Biodiversity - Waterway and wetland habitat overlay
- OM4 Bushfire hazard overlay
- OM5 Cultural heritage overlay
- OM6 Extractive resources overlay
- OM7 Flood hazard overlay
- OM8 Helidon management area overlay
- OM9A Infrastructure - Energy and water supply overlay
- OM9B - Infrastructure - Emissions and hazardous activities overlay
- OM10 Scenic landscapes overlay
- OM11 Steep land overlay
- OM12A Waterways and water resource catchment Eco-systems overlay
- OM12B Waterways and water resource catchment - Water resource catchment overlay
- OM13 High risk soils - information overlay
- OM14 Transport Noise corridor -information overlay
- OM15 Road hierarchy - information overlay